Bid documents may be examined and obtained electronically via Quest Construction Data Network - Project #10104538 A nonrefundable deposit of $30 will be charged to log into the plan room to obtain each set of Plans and Contract Documents.
The Work generally includes but is not limited to: Roadway reconstruction of approximately 2,780 linear feet of Industrial Way, various concrete improvements, such as, installation of sidewalk, replacement of valley gutter, median curb, commercial driveway or approach improvements, permanent patching outside roadway section, existing storm drain adjustments, striping and signage, and traffic control.
Engineers Opinion of Probable Construction Cost: $1,431,725
